Abstract

This research examines environmental scarcity caused by the construction of the Daratei geothermal power plant, in Ulubelu Village, Golewa District, Ngada Regency. The focus of this research is political and social factors that influence the geothermal development process. This research tries to examine in more depth and analyze the environmental impacts of geothermal power plants in terms of social and political aspects, with the aim of knowing the environmental impacts of geothermal power plant construction projects in terms of social and political aspects. This research uses qualitative research methods with data collection techniques in the form of observation, documentation and interviews, with subjects selected purposively, namely selecting informants with certain considerations. The results of this research were then analyzed using environmental scarcity theory which was viewed from social and political aspects including demand scarcity, supply scarcity, structural scarcity, environmental regulations, public and social approval, and government intervention. The results of this research are the main factors causing environmental scarcity due to several political aspects in the form of lack of government support and policies in encouraging the use of geothermal energy as well as lack of community participation and transparency in decision making.

Downloads

Download data is not yet available.

References

Buku

Gizawi, A. A., Ritohardoyo, S., & Haryono, E. (2017). Kajian ekologi bentanglahan & persepsi masyarakat terhadap rencana eksplorasi panas bumi. Majalah Geografi Indonesia, 31(1), 11.

Haq, A. A. (2022). Politik energi Indonesia dalam mewujudkan Paris Agreement melalui sistem energi geothermal pada kepemimpinan Presiden Joko Widodo 2016-2020.

Sarante, J. (2024). Energi baru dan terbarukan (EBT) sebagai teknologi alternatif di masa depan, dalam mendukung pertahanan negara.

Jurnal

Aldi, H. H. (2021). Pengaruh kelangkaan energi baru terbarukan di Indonesia.

Batubara, B. (2014). Dampak negatif energi geothermal terhadap lingkungan. Kertas Kerja, 1–11.

Fauzi, A., Oxtavianus, A., Khasmadin, M. F., & Harmoko, U. (2021). Kajian potensi dan pemanfaatan energi panas bumi di wilayah kerja panas bumi Patuha Ciwidey. Jurnal Energi Baru dan Terbarukan, 2(2), 101–113. https://doi.org/10.14710/jebt.2021.11187

Iqbal, T., & Malau, H. (2019). Dampak pembangunan pembangkit listrik tenaga panas bumi (PLTP) di Kecamatan Pauh Duo Kabupaten Solok Selatan. Jurnal El-Riyasah, 10(2), 146-154.

Julianto, S. (2018). Bab III - Metode penelitian. Metode Penelitian, 1, 32–41.

Khasmadin, M. F., & Harmoko, U. (2021). Kajian potensi dan pemanfaatan energi panas bumi di wilayah kerja panas bumi Patuha Ciwidey. Jurnal Energi Baru dan Terbarukan, 2(2), 101–113. https://doi.org/10.14710/jebt.2021.11187

Meilani, H., & Wuryandani, D. (2010). Potensi panas bumi sebagai energi alternatif pengganti bahan bakar fosil untuk pembangkit tenaga listrik di Indonesia. Jurnal Ekonomi & Kebijakan Publik, 1(1), 47–74.

Ningsih, N. C., & Nurman, N. (2020). Persepsi masyarakat Nagari Batu Bajanjang terhadap rencana pembangunan pembangkit listrik tenaga panas bumi Gunung Talang. Journal of Civic Education, 3(3).

Puja Pangestu, F., Rahmadianti, N. S., Hardiyanti, N. T., & Yusida, E. (2021). Ekonomi Pancasila sebagai pedoman dalam tujuan pembangunan berkelanjutan SDGs (Sustainable Development Goals) 2030. Prosiding Seminar Nasional Ekonomi Pembangunan, 1(3), 210–219.

Sauni, H., Fernando, Z. J., & Candra, S. (2022). Energi geothermal dalam aturan, masalah lingkungan hidup, dan solusi penyelesaian konflik di masyarakat. Jurnal Rechts Vinding: Media Pembinaan Hukum Nasional, 11(3).

Setyawan, A. (2019). Geothermal energy: A present from the heart of the earth. Diskusi-pojok-energi-Geothermal-Aset, 1–19.

Solikatun, S., Masruroh, Y., & Zuber, A. (2018). Kemiskinan dalam pembangunan. Jurnal Analisa Sosiologi, 3(1). https://doi.org/10.20961/jas.v3i1.17450

Sugiyono. (2013). Menurut Sugiyono (2013), kerangka berpikir dalam alur penelitian. Jurnal Pendidikan, 54–103.

Sugiyono. (2018). Metode penelitian kualitatif (p. 456).

Wangke, W. M. (2011). Dampak sosial ekonomi kegiatan pembangunan proyek lapangan UAP dan PLTP di Modayag Kabupaten Bolaang Mongondow Timur. Jurnal ASE, 7(1), 33–37.

Published

2024-10-03

How to Cite

Maria Elisabeth Bupu, Syahrin B. Kamahi, & Yonatan H.L.Lopo. (2024). Dimensi Politik Lingkungan dalam Pembangunan Pembangkit Listrik Tenaga Panas Bumi (PLTPB) Daratei Desa Ulubelu Kecamatan Golewa Kabupaten Ngada. Demokrasi: Jurnal Riset Ilmu Hukum, Sosial Dan Politik, 1(4), 289–302. https://doi.org/10.62383/demokrasi.v1i4.542

Similar Articles

1 2 3 4 5 6 > >> 

You may also start an advanced similarity search for this article.